Base Metals & Filler Metals | Base Metals | Knowledge Base



    • Popular Articles

    • Weld Log

      The second step in the welding workflow is for welds to be allocated WPS and welders and optionally materials and filler metals. You can do this through the "Weld Log" interface. You will find the "Weld Log" button in the welds list page as well as ...
    • Aramco Reports

      Weld Summary Report SATR-W-2008 The weld summary, welder performance and special process tracking report that is described in the Saudi Aramco document SAEP-1160 can be downloaded from WeldTrace. A sample report in Excel format is attached.  Weekly ...
    • Introduction

      Introducing the help center for WeldTrace, the end to end welding management software. WeldTrace is a total welding management software for creating welding documents, manage welders, and for managing the fabrication jobs.  Create Welding Documents ...
    • Weld Mapping

      WeldTrace's weld mapping tool will let you annotate on a drawing and produce a pictorial weld map as well as create welds in one process. Even though this step is optional, marking up or annotating a drawing to show the exact location of a weld is ...
    • Welder Continuity

      Codes such as AWS D1.1 & ASME IX require welders to weld at least one weld every 6 months in a process they are qualified to in order to maintain their welder qualifications for that process. In WeldTrace, each welder’s log will be updated ...